The Sunny Lane Project

The Sunny Lane Project
May 2010
Showing posts with label bathrooms. Show all posts
Showing posts with label bathrooms. Show all posts

Friday, March 2, 2012

Before and After - Bathroom

The guest bath is now complete thanks to the hard work of my husband and Page Construction Services.

Before:


After:



The photos of the final steps:




(see below for the tear out and the beginning of the restore).

Tuesday, February 21, 2012

Bathroom is Closer

Scott spent a weekend stripping wall paper....the textured fabric kind. Ick.
But, he did it:


Our disgusting bathtub was reglazed.
Before:


After (the photo has some shadow. It really does look great!):

(The tile was touched up and is drying)

New dry wall was added in some places:


and painted (Thanks Annie!):


And a new sub-floor went down (Thanks Ryan!):


Really putting it back together begins tomorrow! Meanwhile, Scott began a porch project which I'll blog about when I have more photos.

Wednesday, February 1, 2012

Bathroom #3

I spent almost all of the month of January away for work. What's the perfect cure for Scott's boredom? A bathroom project. The final bathroom has been stripped, only leaving the tub and tile around the tub. A new sub floor and toilet flange will begin to go in very soon.

In the beginning:


The demo begins:












Down to the studs once again:

Saturday, April 2, 2011

Hello, Old Friend

The snow is gone, spring flowers are popping up (what will they be?), we've ridded our garage of some furniture we no longer wanted and I have a mirror in my bathroom!



Absolutely stunning!!!

Another view (walking in to the room):



I now have a towel rack as well. Apologies for the bad iphone picture but it's easiest. Also, don't judge the 1 towel. I haven't even used this tub since the rack was installed. Maybe today calls for a bubble bath?



And, finally, a toilet paper holder. Living the life of luxury!



There is no way to take an interesting photo of the other things Ryan was able to cross off his list, however, the "bar" area now has a marmoleum floor to match the kitchen/family room area and the transitions from bamboo to marmoleum/marmoleum to marble are complete. He also added some trim above the fireplace.

Still no toilet in the "his" bath. Purchased one but the blue didn't match the original blue sink. Back to square one - trying to figure out how to make the original toilet work.

Still have walls to paint (sigh)and master bedroom furniture to buy as well. The next big round of remodeling will come when we re-do the hall bathroom, add the glass tile back splash in the kitchen, tear out the basement and remodel the walk-in closet.

Possibly today we'll hang the door on the "bar", maybe get serious about what shelves we'll hang in there so a few more boxes can be unpacked and, hopefully, we'll reorganize the garage.

I'll leave you with a photo of the tree which sets right outside our main window in our sun room. It's in the perfect location and is the backdrop for the whole room. It's just started to show it's Spring bloom:

Saturday, January 15, 2011

Bathroom & Blinds

Hi friends....

Things have been slow since the new year. There were little things left to do that aren't very photo friendly...but it's another step toward a mostly finished project. Other than that we've been waiting for a few parts for one of the sinks and one of the toilets as well as waiting on some more funds to hit our bank account.

As of today, my husband (the weekend plumber) has the sink in my bathroom working. We now have two fully functioning bathrooms!

Here's the sink toilet combo:


And the dual flush toilet on it's own:


This toilet replaced the 1979 toilet which was added when this bathroom was added on. Our realtor, Joe Shoemaker, told us he saw this sink at Meridian (downtown) so we snatched it up so all 3 sinks in the house would match. All the guts were changed out of it and it now works!

Last weekend Scott's project was to hang the blinds on the kitchen window. It turned out to be a pretty lengthy project but it's lovely to be able to hide my PJs and bed-head from our neighbors in the morning.



And an up close photo:


Still to go:
Everything needs painted and/or touched up
Caulk (everywhere)
Kitchen back splash
Kitchen pendant light
At least one threshold (maybe more than 1)
White bathroom light and mirror
Blue bathroom toilet
Guest bathroom needs renovated (only room we didn't touch)
New storm doors
Window treatment in bathroom, sunroom, living room, entry way and on the doors (probably some sort of stick on film. We aren't sure yet).
Clean carpet glue off sunroom floor
Clean mortar off the fireplace facing
...and I'm sure there are things I'm forgetting

Once we paint, we can finally finish unpacking!

Friday, December 31, 2010

Happy New Year!

There are 3 guys busy with nail guns, drills and saws running around trying to make this place mostly ready for my annual New Years Day Hangover Brunch. We've been moving furniture in so there will be places to sit. The kitchen is functional. However, the boxes will still be packed. As my husband so lovingly said to me last night: Well, honey, 6 months ago we just wanted to be IN this house.
Perspective.

I spent the morning giving the dog a bath (always needed before we have company) and cleaning windows. If you've been reading from the beginning, you know that's a big job:





I'm only 1/2 way done. My arm needed a break.

There's been quite a bit of progress this week. The bedrooms have trim, the dining room has trim, the garbage disposal is in working order (though the sink is backing up - plumber just pulled in! YAY!), bathroom vanities are up, Scott's medicine cabinet is up, outlets are tested and re-worked to be wired properly, some of our rooms and closets have doors once again and we can almost park a car in the garage since we've moved so much in to the house. Enough words....pictures!

My bathroom vanity (sink coming today, I think):


Scott's medicine cabinet and (now) working sink:


New entry way light is up....let me remind you of the old one first:


And, the new one:


And, finally....my bathtub is bubbling and all lit up. As of today I have a bathroom door as well. I'll be in that puppy ASAP!


We are SO excited to invite people in to our home tomorrow. We may not have paint on the walls and our stuff might be in boxes.....but that just gives everyone something to look forward to next year!

Tuesday, December 28, 2010

Photo updates

I struggle with posting photos as the items are finished and waiting to post all the photos of the room once complete. Not sure which is best....for tonight, an array of photos from the past few days....

Better photo of my tub. I really cannot WAIT to be in this thing. I have bath bombs ready to GO!:


Up close photo of the tile in my bath. Isn't it pretty?


It's a little bit ridiculous how happy I am with this cabinet. I seriously LOVE putting my dishes away. And look, there's room for food processor and kitchenaid mixer on that bottom shelf. Maybe even a slower cooker too! Oh, yeah!:


The original sink added in to Scott's updated bathroom:


The floating, bamboo vanity, hand made by Scott's pal:


It's quite hard to get a photo of a shower door. It's a sliding door but it slides on that poll at the top, between the two wheels.


It's constantly feeling more like a home and less like a construction zone. I tend to hang out in the kitchen since it's the most "done" area. It makes me feel happy.

Tuesday, December 21, 2010

Bathroom Fixtures

The bathroom fixtures went in tonight. No crazy remodeling stories to tell that we can laugh about later. Just several hours of work ending with running water in my bathroom and in Scott's.

First, Scott's shower with 3 sources - overhead rain, wand and the regular shower head:


My sweet looking faucet on my tub:


And, the tub....the beautiful tub:


Tomorrow will bring the cook top. Maybe some trim. Maybe a shower door. Maybe some bathroom vanities. The possibilities are endless now that the bathroom tile is FINALLY done.

Monday, December 20, 2010

Floors Day 2

The bamboo floors are IN! Stranded bamboo. That's important. Stranded is much harder, doesn't scratch the way regular bamboo scratches.

Anyway, another 7am wake up call this lovely Monday. But, FIRST....Ryan had to put the sub floor in:


I should have been documenting this stuff all along but at the end of the day Sunday, we were short 1 piece of sub-floor. No problem! Lowes is 5 minutes away. They were out. Seriously. ONE piece. Anyway, Ryan put it in this morning while the flooring crew worked on the hallway and guest room:



And then the guest room was done:



I wasn't able to get a photo of the floor in, what I'm calling, the yoga room. But it's pretty too. Here's the master bedroom 1/2 way:



And the master bedroom finished:



Finished minus one threshold. We had some extra but had a mess up in the hallway. Cut a new piece. Perfect. Cut the first piece for the threshold to Scott's bathroom. Didn't fit. Cut it again - PERFECT. Put the nail in: it split. So, we'll need to order another piece.

The joys of remodeling.

Update on the bathrooms: Touch up grouting and caulking happened today. Touch up caulking happens tomorrow, I believe. Once that happens: hang the vanities, hang the shower door, add the shower controls, put the toilets and sinks in, hope the plumbing works. That's a joke (sort of).

Update on the kitchen: I was going to wait and post all of the kitchen photos at once but I *THINK* I'm going to be even more busy the rest of the week trying to go through our belongings and move in around the rest of the construction. So, I'll say that the counter tops are IN. The sink and dishwasher are being worked on currently. They MIGHT even work before I go to bed. The cook top is still on the agenda. Ryan says no later than Wednesday night.

The first piece of the counter top:



It was just a tad too long. The shorter piece was quite a bit too short. Awesome fabrication guy was able to take them back to the shop, fix both pieces AND bring them back in the same afternoon.

The sinks in (that's Jeff, the plumber):



To keep with today's theme: The sink had to be pulled out once we saw the hole was properly cut. A clip caught the laminate and pulled it up, causing a hairline fracture. Lots of sad faces happened. Options were considered. Heavy sighs. Long pauses. Then Jeff thought - if we move the sing down more we can cover the rip. BINGO. Happy faces. Jeff just drilled the hole to add the faucet. Now he's on to drilling the hole for the air switch for the garbage disposal. It goes on the other side of the sink.

Here's the laminate we chose:


And.....for something that is now FINISHED! The bar top is DONE (obviously the mirror won't remain there but we are storing things wherever we can these days).



Oh, & we had our first fire in the fireplace....YAY!


Long post but it might be the last you hear from me this month. Maybe.

OOOOH! One last picture...just as I was about to sign off Jeff had the faucet in place. Look at that....