Scott spent a weekend stripping wall paper....the textured fabric kind. Ick.
But, he did it:
Our disgusting bathtub was reglazed.
Before:
After (the photo has some shadow. It really does look great!):
(The tile was touched up and is drying)
New dry wall was added in some places:
and painted (Thanks Annie!):
And a new sub-floor went down (Thanks Ryan!):
Really putting it back together begins tomorrow! Meanwhile, Scott began a porch project which I'll blog about when I have more photos.
Tuesday, February 21, 2012
Wednesday, February 1, 2012
Bathroom #3
I spent almost all of the month of January away for work. What's the perfect cure for Scott's boredom? A bathroom project. The final bathroom has been stripped, only leaving the tub and tile around the tub. A new sub floor and toilet flange will begin to go in very soon.
In the beginning:
The demo begins:
Down to the studs once again:
In the beginning:
The demo begins:
Down to the studs once again: